A commercial EICR (also called fixed wire testing or periodic inspection) is an inspection and test of a business premises’ fixed electrical installation against BS 7671. The Electricity at Work Regulations 1989 require employers and building owners to keep electrical systems safe, and an EICR is the standard way to prove it. Most offices and shops need one at least every 5 years, industrial units every 3 years, and high-risk sites such as swimming pools and petrol stations every year.
Who needs a commercial EICR?
Anyone who controls a non-domestic electrical installation. In practice that means:
- Employers and business owners – the Electricity at Work Regulations 1989 place a duty on you to maintain electrical systems so they don’t cause danger.
- Commercial landlords and managing agents – for landlord-controlled areas, plant rooms and common parts, and often under the terms of the lease.
- Facilities managers running multi-site estates such as retail chains, offices, schools or care homes.
- Charities, churches and community buildings – the duty applies wherever people work or the public visits.
The law doesn’t name a fixed interval for business premises. What it requires is that the installation is maintained. Insurers, the HSE and fire risk assessors all look for a current EICR as evidence of that, which is why it is treated as mandatory in practice.
How often does a commercial building need an EICR?
The interval depends on how the building is used and how hard the installation works. The table below shows typical maximums from IET Guidance Note 3.
| Type of premises | Recommended maximum interval |
|---|---|
| Offices and shops | 5 years |
| Commercial premises (general) | 5 years, or on change of occupancy |
| Schools, colleges and other educational premises | 5 years |
| Hospitals | 5 years |
| Hotels and restaurants | 5 years |
| Public houses | 5 years |
| Churches and village halls | 5 years |
| Industrial units, factories and workshops | 3 years |
| Agricultural and horticultural premises | 3 years |
| Leisure complexes (excluding swimming pools) | 3 years |
| Theatres and places of public entertainment | 3 years |
| Swimming pools | 1 year |
| Petrol filling stations | 1 year |
| Caravan parks, marinas and launderettes | 1 year |
| Construction sites and temporary installations | 3 months |
| Privately and socially rented homes | 5 years (legal requirement) |
| Owner-occupied homes | 10 years, or on change of occupancy |
Intervals for non-domestic premises are the typical maximums given in IET Guidance Note 3 (Table 3.2). The inspector can set a shorter interval on your report, and insurers, licensing conditions or leases can require one.
What a commercial EICR covers
- Distribution boards and sub-mains – condition, labelling, protective devices and their ratings.
- Final circuits – lighting, sockets, fixed equipment, HVAC and other plant, tested on a sample agreed with you.
- Earthing and bonding – main earthing, protective bonding to gas, water and structural steel.
- RCD protection – presence and trip-time testing of residual current devices.
- Insulation resistance, continuity and earth fault loop impedance – the core electrical tests.
- Visual inspection – damage, overheating, unsuitable alterations, missing covers, wiring in poor condition.
It does not cover portable appliances (that’s PAT testing), emergency lighting duration tests (see emergency lighting testing) or fire alarm servicing, though many contractors can do all three on the same visit.
How much does a commercial EICR cost?
Commercial EICRs are priced on the number of circuits and distribution boards rather than the floor area. As a guide from current UK price surveys:
| Premises | Typical price |
|---|---|
| Small office or retail unit (up to about 10 circuits) | £250–£450 |
| Medium premises (10–30 circuits) | £400–£800 |
| Large, multi-board or three-phase sites | Quoted after a survey, often per circuit |
See the full commercial EICR cost guide for per-circuit pricing and what pushes the price up.
Keeping the business running during testing
Testing means switching circuits off, one at a time. A good contractor will plan this with you:
- Testing outside trading hours, at weekends or during school holidays.
- Phasing the work board by board so only one area is affected at a time.
- Agreeing in advance which circuits can’t be switched off, such as servers, refrigeration or medical equipment, and recording them as limitations.
More detail: can an EICR be done without shutting the business down?
What you get at the end
An Electrical Installation Condition Report showing the extent of the inspection, any limitations, schedules of test results for every circuit tested, a list of observations coded C1, C2, C3 or FI, an overall result of satisfactory or unsatisfactory, and the recommended date of the next inspection. If anything is coded C1, C2 or FI, ask for a separate quote for the remedial work.
Frequently asked questions
Is a commercial EICR a legal requirement?
No law names the EICR specifically, but the Electricity at Work Regulations 1989 require electrical systems to be maintained to prevent danger. A current EICR is the accepted evidence that you’ve done this, and most insurers require one.
What is the difference between fixed wire testing and an EICR?
None. Fixed wire testing is the industry name for testing the fixed installation; the EICR is the report it produces.
How long does a commercial EICR take?
A small office or shop can often be done in half a day. Larger sites with several distribution boards can take several days and are usually phased to avoid disruption.
Who is responsible for the EICR in a rented commercial unit?
It depends on the lease. Tenants are usually responsible for the installation inside their demise, and the landlord for landlord-controlled areas and supplies. Check your repairing covenants.
Do I need a separate EICR for each building?
Each separate installation needs its own report. On a multi-site estate, each site gets its own EICR, though one contractor can schedule them all.
Related guides
Sources
- HSE: HSR25 – Memorandum of guidance on the Electricity at Work Regulations 1989
- IET: Inspection and testing FAQs (Guidance Note 3, Table 3.2)
- IET Wiring Matters: Periodic inspection or planned maintenance
- Fergus: Commercial EICR – scope, frequency and cost (2026)
This guide is general information, not legal advice. Rules differ between England, Wales, Scotland and Northern Ireland.