An EICR usually takes 1–2 hours for a flat, 2–4 hours for a typical house, and half a day or more for an HMO or small commercial unit. Large commercial sites with several distribution boards can take several days and are normally phased. Writing up the report takes extra time afterwards.
Typical times on site
| Property | Time on site |
|---|---|
| Studio or 1–2 bed flat | 1–2 hours |
| 3-bed house | 2–3 hours |
| 4+ bed house | 3–4 hours |
| HMO | Half a day or more |
| Small office or shop | Half a day |
| Multi-board commercial site | 1–5+ days |
What makes it take longer
- More circuits and distribution boards.
- Poor labelling, so circuits have to be traced.
- Older wiring, alterations and DIY work.
- Restricted access, occupied rooms or circuits that can’t be switched off.
When will I get the report?
Usually within 1–5 working days. Landlords should leave time to send it to tenants within the 28-day deadline.
Frequently asked questions
Can an EICR be done in an hour?
For a small flat, possibly. For a house, an hour usually means not enough has been tested.
How long will the power be off?
Each circuit is off for minutes at a time, and the whole supply only briefly.
Can an EICR be done the same day I book?
Some contractors offer same-day or next-day slots, depending on demand in your area.
Related guides
Sources
This guide is general information, not legal advice. Rules differ between England, Wales, Scotland and Northern Ireland.